VDOT Tunnel Expansion ASQ Meeting

Jacob Brown gave a detailed account of VDOT’s Hampton Roads Bridge-Tunnel Expansion project.   Section 1128 was enlighten on how the project will expand the Hampton Roads bridge tunnel from two lanes each way to at least three lanes each way.